Installation Process

At ShieldUp, we design our roofing systems to be fast, secure, and easy to assemble. Whether you’re adding a PodRoof Kit, awning, or custom cover, our installation process ensures your structure is ready to perform without the need for complicated tools or welding.

  • Step 1: Site Preparation

    • Clear and level your container yard, driveway, or workspace.
    • Ensure the area is accessible and safe for assembly.
  • Step 2: Container or Base Setup

    • Position your containers (if applicable) on solid, level ground.
    • Make sure they are aligned to match your chosen roof span.
  • Step 3: Frame Assembly

    • Our precision-engineered steel trusses and beams arrive pre-drilled for easy bolting.
    • Simply follow the step-by-step guide to connect components securely.
  • Step 4: Roof Panel Installation

    • Attach roof panels to the frame using the provided hardware.
    • Panels overlap tightly to ensure weather resistance and durability.
  • Step 5: Gutter & Trim Finishing

    • Install gutters, downspouts, and trim for a clean finish and effective water drainage.
    • Choose from 14 available color options to match your style.
  • Step 6: Final Check

    • Inspect connections and fasteners for security.
    • Confirm all panels, trim, and accessories are properly aligned.

Why Our Installation Is Different

No Field Welding Required – All systems use container pinpoints and bolt connections.

DIY-Friendly – Designed for easy assembly by contractors, teams, or even skilled DIY owners.

Custom Engineering Support – For larger or unique projects, our team provides detailed guidance and technical drawings.

Time-Saving Design – Most installations can be completed within a day, depending on project size.

Watch Our Installation Video