Installation Process
At ShieldUp, we design our roofing systems to be fast, secure, and easy to assemble. Whether you’re adding a PodRoof Kit, awning, or custom cover, our installation process ensures your structure is ready to perform without the need for complicated tools or welding.
-
Step 1: Site Preparation
- Clear and level your container yard, driveway, or workspace.
- Ensure the area is accessible and safe for assembly.
- Clear and level your container yard, driveway, or workspace.
-
Step 2: Container or Base Setup
- Position your containers (if applicable) on solid, level ground.
- Make sure they are aligned to match your chosen roof span.
- Position your containers (if applicable) on solid, level ground.
-
Step 3: Frame Assembly
- Our precision-engineered steel trusses and beams arrive pre-drilled for easy bolting.
- Simply follow the step-by-step guide to connect components securely.
- Our precision-engineered steel trusses and beams arrive pre-drilled for easy bolting.
-
Step 4: Roof Panel Installation
- Attach roof panels to the frame using the provided hardware.
- Panels overlap tightly to ensure weather resistance and durability.
- Attach roof panels to the frame using the provided hardware.
-
Step 5: Gutter & Trim Finishing
- Install gutters, downspouts, and trim for a clean finish and effective water drainage.
- Choose from 14 available color options to match your style.
-
Step 6: Final Check
- Inspect connections and fasteners for security.
- Confirm all panels, trim, and accessories are properly aligned.
Why Our Installation Is Different
No Field Welding Required – All systems use container pinpoints and bolt connections.
DIY-Friendly – Designed for easy assembly by contractors, teams, or even skilled DIY owners.
Custom Engineering Support – For larger or unique projects, our team provides detailed guidance and technical drawings.
Time-Saving Design – Most installations can be completed within a day, depending on project size.